Hosting capacity analysis: where the rooftop PV numbers come from

A two-story house with solar panels installed on its roof under a clear sky

Hosting capacity analysis answers one question for a given feeder or line section: how much more DER can connect before something on the circuit, voltage, thermal loading, protection coordination, hits its limit. It's a load flow study run against the feeder model, usually in a tool like Synergi, CYME, or OpenDSS, with distributed generation added at various points to see where the model breaks.

The study itself is solid engineering. What trips up most planners is the input data that goes into the model before the math runs.

What a hosting capacity study ingests

A typical run pulls from a handful of sources: the connectivity model (conductor sizes, transformer ratings, protection settings), load data from AMI or load research, and existing DER, meaning everything already interconnected on that circuit. That last input is where the gap shows up.

"Existing DER" usually means the interconnection queue: applications filed, systems approved, systems that completed inspection and got PTO. That's a real list, and it's the one most hosting capacity tools default to. It's also chronically behind what's physically on the circuit. A homeowner who installs panels through a smaller installer, finances through a lease that changes the paperwork trail, or sits in a backlog at the utility's interconnection desk for months, shows up on a roof well before they show up in the queue.

Run a hosting capacity study using only queue data and you're modeling a circuit with less rooftop PV than it actually carries. Depending on how far behind the queue is for that territory, that's not a rounding error, it changes where the model says headroom exists.

Why feeder-level PV counts matter more than system-wide totals

A county or utility-wide solar adoption number is close to useless for hosting capacity work. The study runs per feeder, sometimes per line section, because that's the unit where thermal and voltage limits bind. One feeder with twelve new rooftop systems in a cul-de-sac can be tighter than a feeder with fifty systems spread across its whole length. Planners need DER penetration by circuit, not a regional percentage.

That's also why windshield surveys and manual permit pulls persist as a stopgap in a lot of planning groups, even though everyone involved knows they don't scale. Permit data tells you an application was filed; it doesn't tell you a panel went on the roof, and pulling permits for even a handful of feeders eats a planner's week.

A roof-level view from imagery closes a different gap than the queue does. It doesn't replace the interconnection data, it checks it. Comparing an annual imagery pass against the queue for a feeder tells you where systems are generating before they're reflected in the model, and roughly how much usable roof area is left if the circuit still has room.

Rooftop Solar Potential was built for that specific comparison. It breaks every roof into individual planes, scores azimuth, tilt, and shading for each one, and re-checks the same roofs every year to flag which went from bare to panelled. The output is a map layer of usable roof area by feeder, paired with a year-over-year adoption count, so you're reconciling the hosting capacity model's DER input against something closer to ground truth without sending anyone out to count panels. If your group is sizing next year's rooftop PV forecast and the queue data feels stale, that feeder-by-feeder view is worth a look.

A note on cadence

Hosting capacity studies get re-run on their own schedule, often annually or ahead of a planning cycle, and that cadence matches an annual imagery pass better than it matches a continuously updated queue. An annual pass timed to land before the next study cycle gets the DER count closer to what's really interconnected on each feeder, paperwork lag and all.

Get the imagery pass done once a year, reconcile it against the queue for the feeders you're about to re-study, and the hosting capacity numbers coming out the other end start matching what field crews see when they roll a truck.