Blog

Field notes: two neighboring feeders split on solar, the substation explained why

A suburban neighborhood of houses with yards and driveways, seen from a rise, under a partly cloudy sky.

Two feeders off the same substation, same vintage subdivision on either side of a county road, same roof pitch and the same builder's shingle color from 2004. On paper they should track each other almost exactly for rooftop PV. They didn't.

Feeder A had gone from maybe 40 panelled roofs to something closer to 130 over four seasons. Feeder B, across the road, sat flat under 50 the whole time. Same incentive program, same utility rate class, same solar installers canvassing the subdivision, going door to door with the same flyers. A planner I talk to pulled the interconnection applications for both circuits expecting to find a messaging gap or a difference in household income that the census tract data didn't quite capture. Neither explained it.

What explained it sat further upstream than either feeder. The substation serving both circuits had added a second transformer bank six years back, and when it came time to rebalance load, Feeder A got reassigned to the new bank while Feeder B stayed on the original one, which was already running closer to its thermal limit on summer peak. Nobody told the homeowners, and nobody needed to. Every new interconnection request on Feeder B triggered a supplemental review that Feeder A's didn't, because the hosting capacity study flagged the circuit as tighter. A few installers stopped quoting jobs on that side of the road after watching two applications sit in review for months. Word travels through a trade fast, even when nobody writes it down anywhere a planner would see it.

This is the part that's easy to miss if the only tool in front of you is a feeder-level adoption count. The number alone says Feeder B is "underperforming" on solar relative to its neighbor, and a planner reading that cold would guess outreach: a marketing push, a rebate the county isn't advertising well enough. But the roofs on Feeder B were never the bottleneck. A roof-by-roof read of that circuit showed plenty of south and southwest-facing planes with minimal shading, just as viable as anything across the road. The gap wasn't rooftop supply. It was something sitting between the meter and the grid that no amount of bare-roof inventory would ever surface.

That's the distinction that matters for load forecasting on the DER side. A feeder with low adoption and high roof viability is a different planning problem than a feeder with low adoption because the roofs genuinely don't support it, tree cover, wrong orientation, three-story shade from the building next door. One is a circuit waiting for a capacity upgrade or a reassignment to catch up to demand. The other is close to its ceiling already. Mixing those two into one number flattens exactly the thing a planner needs to see.

The field notes habit worth building here isn't complicated: when a feeder's adoption curve looks off relative to a comparable neighbor, check the roof stock before you reach for a demographic or behavioral explanation. If the roofs are there and the panels aren't, the answer usually sits in the interconnection queue or the substation configuration, not in the marketing budget. If the roofs genuinely aren't there, that's a different conversation with the DER forecast entirely.

We built a feeder-by-feeder read of usable roof area precisely so that comparison takes an afternoon instead of a pile of permit pulls and a drive around the subdivision. Run your own feeder pair through it and see which story your gap is actually telling.

Start a project