A planner I talk to pulled up a feeder on the east side of a mid-size circuit last spring. Two interconnection applications on the same cul-de-sac, both filed within three weeks of each other. Nothing unusual, he figured. People replace roofs, people retire, people finally get around to the thing they've been pricing out since 2019.

By September that same cul-de-sac had twenty systems. Not scattered across the circuit. Not even across the subdivision. Twenty panels on roofs within sight of each other, on a loop of maybe thirty-five houses.

This is a block story as much as a solar story.

Adoption doesn't spread the way load forecasting models like to assume it does, as a smooth percentage climbing a curve year over year. It moves in clusters, the same way a new fence style or a particular shade of paint moves through a neighborhood. Someone gets a system installed, the crew is on site for three days with a lift truck and a pile of racking in the driveway, and every neighbor who's been on the fence walks over to ask about it. The installer who did house one is often back on the same street for house four, five, and six, because referrals from a happy customer close faster than any ad spend. Financing terms that worked for one household get passed along at the mailbox. HOA questions get answered once and then repeated at the next block party.

None of that shows up in a permit count the week it happens. Permits lag installs, installs lag site visits, and by the time a planner notices the cluster in the interconnection queue, the circuit's already carrying more behind-the-meter generation than the original hosting capacity study assumed for that feeder segment.

This matters more at the feeder level than it does citywide, because citywide averages smooth the spikes out. A utility might report two percent residential PV penetration for the year and feel comfortable with that number, while one specific lateral off one specific transformer bank just went from near-zero to a third of its homes generating. Voltage rise doesn't care about the citywide average. Neither does reverse power flow at the substation relay. The cluster is the thing that actually stresses equipment, and the cluster is exactly what gets lost when adoption is tracked as a rolled-up annual figure instead of a spatial one.

The roofs themselves tell you something the permit record can't: which ones were even candidates in the first place. A block can have thirty-five houses and only twenty-two of them with usable south- or west-facing plane, decent tilt, and low enough shading loss to pencil out. If that block already has twelve systems installed, a planner looking at raw rooftop count might assume there's a lot of headroom left. Looking at it by usable roof area tells a different story: that circuit segment may already be most of the way to its practical ceiling, and the next cluster is going to happen two streets over, on the block that still has all its candidate roofs bare.

That's the pattern Rooftop Solar Potential is built around. It scores each roof plane for solar viability once, then runs an annual pass over the same roofs to flag which ones went from bare to panelled, so the clustering shows up on a feeder map instead of getting caught after the fact in an interconnection queue.

If you're the one who has to explain to planning why a feeder jumped faster than the forecast said it would, that's worth a look before next year's cluster starts.